Each step up adds one |x − x̄|. The dashed line goes from 0 to the total, and its slope is the MAD: the average height of a step.
distanceslope = MAD
Work table
Every value, its distance from the mean and the running total.
#
x
x − x̄
|x − x̄|
Running total
How mean absolute deviation calculator with work works
The mean absolute deviation calculator with work works by writing out every line of the solution in 4 parts: the given data, the mean with every value added, 1 distance line per value, and the sum divided by n with the answer boxed.Copy work puts the full solution on the clipboard as plain text.
GivenThe data and n.
MeanEvery value added, then divided by n.
Distances1 line per value: |xᵢ − x̄|.
Sum and divideΣ|xᵢ − x̄| ÷ n, answer boxed.
The calculator shows the work 3 ways: a written solution, a running total chart and a work table. The default homework set 12, 15, 11, 18, 14 gives the solution below, with MAD = 2.
Mean absolute deviation calculator with work technique
The most dependable mean absolute deviation calculator with work technique is line-by-line comparison: place your work next to the written solution and compare from the top; the first line that differs holds the mistake. The running total locates a slip inside a long sum.
Each step up is 1 distance. The running total climbs 2 → 3 → 6 → 10 → 10. The dashed line rises 2 per value on average, which is the MAD.
4 common mistakes on the example
Mistake
Wrong result
Right result
Dropping the absolute value bars
0
2
Dividing by n − 1 = 4
2.5
2
Rounding the mean 3.53 to 4 (decimals sample)
0.8
0.7
Skipping the formula and substitution lines
Answer with no visible method
9 lines of work
Dropping the bars always gives 0. Dividing by n − 1 always gives a result 5 ÷ 4 = 1.25 times too large for 5 values.
Frequently asked questions
What is the mean absolute deviation of 12, 15, 11, 18, 14 with work shown?
What are the most common mistakes when showing work for mean absolute deviation?
The 4 most common mistakes are dropping the absolute value bars, dividing by n − 1 instead of n, rounding the mean too early and skipping the substitution line. For 12, 15, 11, 18, 14, dropping the bars gives 0 instead of 2, and dividing by n − 1 gives 2.5 instead of 2.
Do I need to write the formula when showing work?
Yes, write the formula MAD = Σ|xᵢ − x̄| ÷ n as the first line of the work. The formula line tells the grader which statistic you calculate, mean absolute deviation and not median absolute deviation or standard deviation, and each later line fills in 1 part of the formula.
How many lines does the work for mean absolute deviation take?
The work for mean absolute deviation takes n + 4 lines: 1 formula line, 1 mean line, n distance lines, 1 sum line and 1 answer line. A data set of 5 values takes 9 lines, and a data set of 12 values takes 16 lines.
How should I show my work for mean absolute deviation?
Show the work for mean absolute deviation in 5 parts: the formula, the mean with every value added, each distance |x − x̄| on its own line, the sum of the distances, and the division by n. The written solution on this page follows that layout line by line.
Can I copy the work into a document?
Yes, Copy work puts the full written solution on the clipboard as plain text. Paste the solution into a document, an email or a homework portal.
What does the running total chart show?
The running total chart shows the sum of the distances growing 1 value at a time. Each step up is one |x − x̄|. The dashed line runs from 0 to the final total, and the slope of the dashed line (rise per value) is the MAD.
Should I round the mean before finding the distances?
No, keep the full mean until the end and round only the final answer. Rounding the mean early changes the MAD: for 2.5, 3.1, 4.8, 2.9, 3.7, 4.2, rounding the mean 3.53 to 4 gives 0.8 instead of 0.7. Set the decimal places to match what your teacher asks for.